​Quality custom & restoration sheet metal work & repair

​Then in my lathe I turned the one side down to a press fit into the tooling, now a fresh soft form.

First the tower was out of a robotic welding shop from the overhead gantry so it's real stout. The sides are 1 1/4 inch thick plate 12 inches wide and the front is 1/2 inch plate 20 1/2 inches wide and the back is 1/2 in thick with reinforcement ribs not allowing the welder to twist. The 3/4 inch thick base plate is 48 x 63. The tower was to tall so I cut off about 24 inches.

Lots of stuff always going on in my shop.

Phone calls always best

206 234 8032

Danny Pascoe

​Its hockey puck time, I have a bunch for this type of work. I dug out the old insert.

​Cleaning up the tower.

Several years ago I bought these Mittler Brothers dies.

I am now building a long wanted New Larger Coach Builder Style Power Hammer

I cleaned off the surface rust next I will trim them to length.

​220 Motor foot control and drive shaft.

The tower is now moved inside, I will get it cleaned up while waiting for the drive system.


The slide with the eccentric and slide assembly and tooling mounts.

110 to 220 VFD control

​More to come once the arms get here.

​The front drive system arrived

I just ordered the drive system and arm plans

form Mittler Brothers.

I am selling the plans I bought for the tower and arms as I ordered their arms. $150 includes shipping. Originals not reprint 17 Pages.

​More drive assembly parts.

This is the lower soft forming die it needs a freshen up, the insert was rescessed from use.

​Change of plans I decided to buy Mittler Brothers pre made arms, they will shorten the actual machine build time. I have to much other stuff in shop going. So they are on order great company to deal with Call My guy Ray if you need any thing tell him Danny Pascoe sent you I don't get any thing just as a reference.  

Their pre made arms.​ and not using their tower in this picture.

Arm tubing 4x8 1/4 wall for the arms and the 4x6 1/4 wall lower arm support brace.

​The chanel iron will be cut and welded to the sides for lifting tabs.